TTU Honors Residence Hall

TTU Honors Residence HallLubbock, Texas The new Texas Tech University’s Honors Residence Hall is a 77,292-square-foot, four-story co-ed dorm featuring 153 double and seven single units over four floors. The building features four large lounge spaces, including a main lounge and a 50-seat multi-purpose room for special group meetings and presentations, plus a full-service Starbucks.…

UT at Arlington Engineering Research Building

UT at Arlington Engineering Research BuildingArlington, Texas The Engineering Research Building provides the University of Texas at Arlington a state-of-the-art facility for multidisciplinary research and teaching. The building’s design incorporates several energy-saving features, including green and light-reflecting roofs, window designs for improved use of available light, rain and condensate water capture and storage for landscaping,…

Tarrant County Jail & Corrections Center

Tarrant County Jail & Corrections CenterFort Worth, Texas Clad in the same distinctive pink granite used on the County’s historic 1895 courthouse, the new Tarrant County Jail is a 207,700 square feet, 5 story maximum security facility built to house the County’s “worst of the worst” prisoners. The new Tarrant County Jail includes 444 maximum…

HCA Plaza Medical Center, ED Expansion

HCA Plaza Medical Center, ED ExpansionFort Worth, Texas The new patient tower at HCA Plaza Medical Center is the most recent addition to what is known as “Medical City, Fort Worth”. The expanded Emergency Department takes up most of the new first floor and has 30 patient rooms equipped for varying degrees of illness and…

JW Marriott San Antonio Hill Country Resort and Spa

JW Marriott San Antonio Hill Country Resort and Spa San Antonio, Texas A world-class luxury resort on 600 acres in North Bexar County, the JW Marriott San Antonio Hill Country Resort and Spa includes 1,002 hotel rooms and 288,000 square feet of convention and meeting area. A premier destination, the resort also offers a 36-hole…

Westchester Medical Center Ambulatory Care Pavilion

Westchester Medical Center Ambulatory Care PavilionValhalla, New York In 2017, the Westchester  Medical  Center  began a  $230  million expansion,  encompassing a 270,000-square-foot Ambulatory Care Pavilion on its Valhalla campus. The sleek eight-story glass and steel building is the largest health care construction project in Westchester County since the construction of Westchester Medical Center’s main tower…

UTMB Jennie Sealy Replacement Hospital

UTMB Jennie Sealy Replacement HospitalGalveston, Texas The new Jennie Sealy Hospital opened in April 2016 and was built on the site of the former Jennie Sealy and old Shriner’s buildings in Galveston. The $438 million facility features 13 floors and 310 patient rooms, including 60 dedicated ICU beds, a 28-bed day surgery unit and 20 state-of-the-art…

Methodist West Houston Hospital

Methodist West Houston HospitalHouston, Texas The Methodist West Houston Facility includes a six-story, 474,000 square foot hospital and a 162,000 square foot medical office building. DSI’s scope included HVAC piping, duct work, sanitary piping and medical gas systems. The scope exceeded 450,000 manhours during 27 months. DSI RolesMechanical Contractor, Plumbing Contractor, Medical Gas Contractor, Design…

Genzyme Cell Culture Expansion

Genzyme Cell Culture ExpansionFramingham, Massachusetts Genzyme is an American biotech company headquartered in Cambridge, Mass. For the company, which manufactures 11 major drugs, DSI worked on a 59,000-square-foot expansion of a Cell Culture facility, that produces Fabrazyme, a treatment for Fabry disease, in Framingham, Mass. To maximize production, reduce costs and lower the on-site manpower…

Evergreen Solar

Evergreen SolarDevens, Massachusetts Evergreen Solar’s facility in Devens, Mass., was their first large-scale manufacturing plant in the U.S. able to produce 80 megawatts. For the first phase, DSI’s scope included process piping, chemical distribution and tool hook-up. The project schedule was extremely aggressive, and DSI was brought on board prior to design being complete, which…