VGXI Project Dolphin

Conroe, Texas

The VGXI Project Dolphin facility hosts RNA and DNA pharmaceutical manufacturing. The project started in May of 2021 and will be complete in March 2022. Dynamic Systems, Inc. has been involved in the project from preconstruction budgeting and design assist to mechanical, plumbing and process piping contractor.

The project metrics include:

• Chiller Tonnage: 824
• Process Chiller Tonnage: 270
• Supply CFM: 244,000
• Exhaust CFM: 17,500
• Process Systems: WPU, WFI, CS, CSC, CIPR, CIPS, P, PD, PV, O2, N2, PA, & IA

DSI RolesPreconstruction Budgeting
Design Assist
Mechanical Contractor
Plumbing Contractor
Process Piping Contractor
Self-Performed WorkHVAC Piping
HVAC Sheet Metal
Plumbing
Process Piping
Project Size118,045 sq. ft
Chiller Tonnage: 824
Process Chiller Tonnage: 270
Supply CFM: 244,000
Exhaust CFM: 17,500