Texas Health Resources Harris CUP Remodel
Fort Worth, Texas
The project consisted of remodeling the central utility plant (CUP) that generates chilled water to supply air conditioning for Texas Health Resources Harris Hospital.
Dynamic Systems, Inc. demoed two existing chillers, two chilled water pumps, two condenser water pumps, and associated chilled/condenser water piping. DSI installed two 1850-Ton chillers, four 125-horsepower pumps, and new piping for chiller and pump drops.
DSI Roles | Mechanical Contractor |
Self-Performed Work | HVAC Piping |
Project Size | Two 1850-Ton Chillers, Four 125-Horsepower Pumps |
Total Volume | Estimated $3.5 million |