Laboratory infrastructure relies heavily on extensive mechanical HVAC and plumbing systems, contain fume hoods, toxic and hazardous chemicals, cleanrooms, waste neutralization, lab gases and ultrapure water. Integrating these systems relies heavily on fully coordinating the BIM model. We have significant 3D design capabilities that allow us to develop a fully coordinated facility.