The Methodist West Houston Facility includes a six-story, 474,000 square foot hospital and a 162,000 square foot medical office building. DSI’s scope included HVAC piping, duct work, sanitary piping and medical gas systems. The scope exceeded 450,000 manhours during 27 months.

Methodist West Houston Hospital
Houston, Texas
DSI Roles | Mechanical Contractor, Plumbing Contractor, Medical Gas Contractor, Design Assist, Preconstruction Services |
Self-Performed Work | Mechanical Contractor, Plumbing Contractor, Medical Gas Contractor, Design Assist, Preconstruction Services |
Project size | 474,000 sq. ft., 6 stories |
Total Volume | $225 million |