CyrusOne San Antonio V is the newest state-of-the-art, purpose-built data center in the Texas region adding an additional 18 MW to the city’s 63 MW total. This campus has 50,000 square feet of raised space per floor and provides connection to the San Antonio Metro IX and CyrusOne National IX with on-ramps to major cloud providers through Megaport.
The San Antonio data center is well-suited for enterprise clients that require a robust data center infrastructure for mission-critical applications. This location is in an area considered one of the safest in the country, free from natural disasters including seismic activity, tornados and hurricanes. San Antonio V also offers Class A office space as well as CyrusOne’s seven layers of physical security.
With some of the lowest power cost in the country, this San Antonio data center facility can scale up to 20 megawatts of power from multiple substations.
DSI Roles | Mechanical Contractor, Plumbing Contractor |
Self-Performed Work | HVAC Piping, HVAC Sheet Metal, Plumbing |
Project Size | 200,000 total sq. ft, 2N redundancy, 18 total megawatts |
Total Volume | $30 million |